New Building Site Picture Selection

Originally there were twenty trees and a building to be removed.
New pictures will be added periodically to show progress.
Please scroll down to the date of pictures you wish to see.


Please Select the Desired Site Pictures Below:

[ 08 Oct 2004, Tearing down old building]
[ 16 Oct 2004, Removing old building and tree brush]
[ 23 Oct 2004, Removing old building and tree brush ]
[ 23 Oct 2004, Sawing trees and removing brush]
[ 30 OCT 2004, Removing trees and brush ]
[ 30 Oct 2004, Removing tree brush ]
[ 30 Oct 2004, Removing logs and brush ]
[ 04 Nov 2004, Buldozer removing logs & stumps ]
[ 05 Nov 2004, Removing debris and stumps ]
[ 06 Nov 2004, Removing Brush ]
[ 12 Nov 2004, Building site almost cleared ]
[ 26 Dec 2004, Showing construction preparation ]
[ 30 Jan 2005, Showing construction fence around site ]
[ 04 Feb 2005, Digging to tunnel under Mexico Road ]
[ 08 Feb 2005, Prepairing to Drill under street for water main ]
[ 09 Feb 2005, Drilling and inserting pipe under street for water main ]
[ 11 Feb 2005, After the drilling was completed ]
[ 12 Feb 2005, Water main and fire plug installation ]
[ 15 Feb 2005, Digging for sewer pipe installation ]
[ 16 Feb 2005, Fire Plug, Water Main, Some Sewer Drains installed (trees) ]
[ 17 Feb 2005, Cleaning front loader, drilling hole almost filled ]
[ 18 Feb 2005, Building Site Sign, Storm drain system ]
[ 19 Feb 2005, More Building Site Sign, Storm drain system ]
[ 23 Feb 2005, Preparing land for construction of building ]
[ 25 Feb 2005, Truck delivering desicant, large stump, site preparation ]
[ 02 Mar 2005, Preparing foundation trenches and building site ]
[ 02 Mar 2005, Some foundation concrete poured ]
[ 03 Mar 2005, More foundation concrete poured ]
[ 04 Mar 2005, All foundation concrete completely poured ]
[ 07 Mar 2005, All foundation concrete forms removed, grading performed ]
[ 08 March 2005, Floor area marked for plumbing ]
[ 09 March 2005, Foundation insulation installed, plumbing material delivered ]
[ 10 March 2005, Plumbing work was started ]
[ 11 March 2005, More plumbing work was done ]
[ 16 March 2005, Plumbing inspection done, preparing to pour floor concrete ]
[ 17 March 2005, Ready to pour floor concrete ]
[ 18 March 2005, Pouring and smoothing floor concrete ]
[ 19 March 2005, Pouring and smoothing floor concrete completed ]
[ 23 March 2005, Raising the walls ]
[ 25 March 2005, More raising the walls ]
[ 28 March 2005, Wall framing done, plywood sub siding installed ]
[ 29 March 2005, Some inside wall framing done, outside plywood sub siding finished ]
[ 30 March 2005, More inside wall framing done, ]
[ 31 March 2005, Trusses delivered to site, more inside wall framing done ]
[ 03 April 2005, Inside wall framing appears completed ]
[ 04 April 2005, Building ready for truss installation ]
[ 06 April 2005, Truss installation 1 ]
[ 06 April 2005, Truss installation 2 ]
[ 06 April 2005, Truss installation almost completed ]
[ 07 April 2005, Truss installation complete except for peaks ]
[ 08 April 2005, Truss installation complete with peaks ]
[ 14 April 2005, Church members install sub roofing plywood ]
[ 15 April 2005, Church members finish sub roofing plywood side 1 ]
[ 16 April 2005, Sub roofing plywood done, sub roofing tar paper done side 1, Wiring started ]
[ 18 April 2005, Some Roofing done side 1, some sub roofing tar paper done side 2 ]
[ 24 April 2005, All roofing completed, some electrical, windows, doors installed ]
[ 30 April 2005, More of the following installed: ducts, baptistry,electrical, podium ]
[ 08 May 2005, Ready for brick, more of the following installed: ducts, baptistry,electrical, podium, plumbing ]
[ 09 May 2005, Masonery work started ]
[ 10 May 2005, Brick work progressing ]
[ 14 May 2005, Brick work almost done ]
[ 18 May 2005, Brick work done, side sofits done, most insulation done, electrical wiring trench done ]
[ 19 May 2005, Canopy trusses done, siding 1/2 done ]
[ 23 May 2005, Canopy, siding, wall board, sidewalks almost done ]
[ 30 May 2005, outside of building almost done, inside ready for painting ]
[ 12 June 2005, Progressing Inside ]
[ 22 June 2005, Parking lot progress, progress inside ]
[ 23 June 2005, Parking lot progress, laying asphalt ]
[ 26 June 2005, Parking lot asphalt completed, flowers planted ]
[ 28 June 2005, Parking lot stripes completed, interior progress ]
[ 04 July 2005, Shrubs & flowers planted, airconditioners & doors installed ]
[ 12 July 2005, Ready for carpet installation ]
[ 13 July 2005, Starting to install carpet ]
[ 14 July 2005, Carpet installation, class rooms completed ]
[ 16 July 2005, Carpet installation completed except for cleanup ]
[ 18 July 2005, Pews delivered, installation started ]
[ 19 July 2005, Pew installation completed ]
[ 11 August 2005, Inside Pictures Final 1 ]
[ 11 August 2005, Inside Pictures Final 2 ]
[ 11 August 2005, Inside Pictures Final 3 ]
[ 11 August 2005, Outside Pictures Final 1 ]
[ 10 Sept 2005, Sod lain, grass seed sown in storm drain retaining pond ]
[ 22 Sept 2005, New sign, podium, and communion table ]
[ 07 Oct 2005, New sign with lettering ]